Water tracking and repeat callouts
Water enters at one detail and drips somewhere else entirely, so single point patches are aimed at the wrong place. Mapping every defect before specifying is the only way to break the callout cycle.
Factories, warehouses and industrial units
You find the real entry point, correct the defect, and then remove the roof's vulnerability with a continuous membrane. On factory and warehouse roofs water rarely enters where it drips: it travels along purlins, through laps and back along fixings before it appears inside. SprayGrade is a cold applied liquid rubber that seals the whole roof area in one seamless 2.0 mm membrane, so the building keeps operating while the leak is designed out rather than patched.
Investigate the cause before specifying repairs or a coating.
Water enters at one detail and drips somewhere else entirely, so single point patches are aimed at the wrong place. Mapping every defect before specifying is the only way to break the callout cycle.
Once water sits in insulation or on ceiling tiles the visible leak appears to stop while the damage continues: corroded purlins, mould, and electrical risk in the void.
Interstitial condensation in a cold metal roof produces the same drips and staining as a defect. Treating it as a leak wastes money; the thermal and ventilation cause has to be recognised at survey.
Every storm is a stock loss, a shutdown and a slip hazard on a wet floor. Insurers increasingly want evidence the roof has been assessed and repaired rather than repeatedly patched.
The number and cause of the failures decide the scope, not a rate per square metre.
For a single, genuinely isolated defect where the surrounding covering still has life. Map the entry point first; patching where the water drips is not a repair.
For a roof failing in several places where the deck and insulation are sound. One seamless membrane across the whole area, applied cold.
Where sheets are perforated, purlins have lost section or insulation is saturated. A structural and moisture survey decides between the three.
Diagnosis
A leaking factory roof is usually a system failure rather than a single hole. Cut edge corrosion eats back the sheet from the eaves and gutter line until the lap opens. Fixings back out under thermal cycling and let water past the fastener head. Rooflight kerbs, vents and soil pipes lose their seals as mastic hardens, and on built-up felt or asphalt the weak points are the laps, upstands and outlets where the covering has lost its elasticity.
Water then moves. It tracks along purlins and deck, so the drip appears metres from the defect that let it in. That is why patch repairs on industrial roofs keep failing: the patch goes where the water lands instead of where it enters, and the next storm finds the same open lap.
Repair options
A patch is right when the defect is genuinely isolated and the rest of the covering has life left in it. It is not a strategy for a roof leaking in several places, because every patch leaves the surrounding laps, fixings and details untouched and the next failure is already developing.
An overlay removes that problem. A liquid rubber system bonds to prepared metal, fibre cement, felt, asphalt and concrete, and puts a new seamless weatherproof layer over the existing roof, so the whole area gains the same protection at once. Replacement remains the correct answer where the deck has lost structural capacity, the insulation is saturated, or the falls cannot be corrected. A survey establishes which of the three situations you actually have.
Programme
SprayGrade is cold applied. There is no flame, no hot bitumen and no solvent fume, so there is no hot works permit, no fire watch and no reason to evacuate the building below. Application runs at 600 to 800 m² per day with a small crew, which means a 2,000 m² roof is typically two to three days of spray time rather than two to three weeks of strip-out.
Works are phased around production: an area is prepared, sprayed and left to cure while the next is set up. Where process or hygiene demands it, night and weekend shifts are used. Internal protection and dust control are agreed at survey stage, and access is planned so edges, rooflights and fragile areas are protected before anyone works near them.
Cost
Cost is driven by measured area, substrate condition, the number of penetrations and details, access method, and how much preparation the roof needs. A rate per square metre that ignores preparation is not comparable with one that includes it, because preparation is where a coating either bonds for fifteen years or peels within two.
Installed liquid rubber systems typically start around £34.50 per m² for qualifying 300 m² projects, with the final rate confirmed after survey. Compare quotations on the same scope: preparation method, primer, membrane thickness, detail reinforcement, access, waste, and the written warranty.
SprayGrade is a seamless, cold applied membrane specified over prepared substrates, which is why it fits the shape of industrial roofing: large uninterrupted areas, many penetrations, and no appetite for strip-out.
The search terms this page covers, and the answer each one gets.
| Search term | Intent | Answer on this page |
|---|---|---|
| industrial roof leak repair | Transactional | Diagnose the entry point, repair the defect, then seal the area |
| factory roof leaking | Informational | Why water travels along purlins before it drips inside |
| industrial roof waterproofing | Commercial | Seamless liquid rubber over prepared metal, fibre cement, felt or asphalt |
| industrial roof recoating | Commercial | When a full recoat beats repeated patch repairs |
| asbestos cement roof repair | Informational | Assessment and controlled encapsulation limits |
Cost is driven by measured area, substrate condition, the number of penetrations and details, access method and how much preparation the roof needs. A rate that ignores preparation is not comparable with one that includes it.
SprayGrade carries a 15-year system warranty and HBS200 a 25-year system warranty, subject to the exact specification, installation and written conditions. Confirm the proposed build-up, exclusions, inspection requirements and whether workmanship cover is separate before placing an order.
Allow for the complete job, not just application output. Preparation, access, curing and weather determine the agreed completion date.
Measure the roof, identify materials and defects, and assess structure, moisture, fragility and drainage.
Confirm the system, preparation, repairs, access protection, work zones and site restrictions.
Use the preparation method appropriate to the material. Complete defect repairs and adhesion checks before coating.
Treat junctions and apply the specified membrane at the required thickness, planned around weather windows.
Record application checks, inspect details and drainage, and provide the agreed warranty and maintenance information.
A survey is normally arranged within 48 hours of enquiry. You get the defects found, the repair options with the case for and against each, and an itemised cost with a programme, so the decision is made on evidence rather than a rate per square metre.
Yes. The system is cold applied, so there are no hot works permits, no flames and no solvent fumes. Work is zoned and phased around production, and night or weekend shifts are used where the process demands it.
Where the deck and insulation are sound, an overlay is usually lower in capital cost and far lower in disruption, because nothing is stripped out. It is not cheaper if the deck is structurally compromised or the insulation is saturated: that has to be replaced, and the survey will say so.
Yes where the material is sound and assessed as suitable. Encapsulation sits within an asbestos management plan: the sheets are coated and sealed rather than disturbed, which reduces fibre release risk compared with strip-out.
The system is a 2.0 mm liquid rubber membrane with a 15 year system warranty available, subject to the written terms, specification and application. Service life depends on the substrate, the specification and routine maintenance of outlets and details.
They are part of the scope, not an extra. Penetrations and upstands are reinforced and encapsulated, gutters are lined or replaced according to condition, and failed rooflights are replaced as part of the same programme.
Send the postcode, approximate roof area, known covering, leak history and operating restrictions. Use existing photographs or drawings; do not access an unsafe roof to obtain them. Survey arrangements and timescales are confirmed with the team.