Leaks over stock and pick faces
A drip above racking is a stock write-off and a slip hazard at height. Zoned refurbishment removes the risk area by area instead of leaving the whole shed exposed.
Warehouses, industrial units and distribution centres
It restores the roof's weatherproofing without necessarily replacing the roof. The covering, fixings, rooflights, insulation and drainage are surveyed, then a new seamless membrane is applied over the prepared existing roof. On portal frame warehouses the objective is to stop water ingress, restore a planned service life and keep despatch working while it happens.
Investigate the cause before specifying repairs or a coating.
A drip above racking is a stock write-off and a slip hazard at height. Zoned refurbishment removes the risk area by area instead of leaving the whole shed exposed.
Ageing rooflights fail under footfall. They are mapped, protected and replaced as part of the scope, which matters both for the works and for the maintenance regime afterwards.
Wet insulation loses performance and keeps the ceiling damp long after the leak is sealed. Moisture survey results decide whether insulation has to be replaced before any coating is applied.
Tenants are usually responsible for keeping the roof watertight. A documented refurbishment with a written warranty is evidence at lease end in a way that patch repairs never are.
The roof condition decides the scope, not a one-size-fits-all coating offer.
For isolated leaks where the surrounding covering remains serviceable. Find the entry point before selecting a repair.
For a sound, compatible roof that needs renewed weatherproofing. Confirm moisture condition, preparation and adhesion first.
For roofs needing more than a coating, including structural defects, extensive perforation or wet insulation. Assess load and thermal requirements.
Scope
A refurbishment is a survey-led scope, not a price per square metre. The survey records the covering type and remaining life, the condition of fixings, the moisture content of the insulation, gutter and outlet capacity, and the condition of every rooflight and penetration.
The specification then follows the findings: seal or replace fixings, replace failed rooflights, line or renew gutters, treat corrosion at cut edges, and apply the membrane over the whole area. Skipping the survey produces the classic outcome where a new coating is applied over saturated insulation and the ceiling keeps dripping.
Refurbish or replace
An overlay wins where the deck and frame are sound and the problem is the weatherproofing layer. Nothing is stripped, so there is no waste to landfill, no open roof, no crane, and a fraction of the programme. On a 5,000 m² warehouse that is the difference between a fortnight and a quarter.
Replacement wins where the sheets are perforated through, purlins are section-lossed, insulation is wet, or falls are so poor that water stands across the field of the roof. Overcladding is the third route, and it adds load, raises the roof line and still leaves the old roof underneath. A structural and moisture survey decides between the three.
Programme
The constraints are stock, fire risk and access. Nothing hot goes near racking, so a cold applied membrane removes the hot works permit argument entirely. Dust and debris are contained, and waste is removed daily rather than stored on the roof.
Work is zoned by bay. Each bay is prepared and sprayed, then handed back, so pick faces and dock doors are never both out of action. Access is planned around delivery slots and MEWP movements in the aisles, with fragile roof protection over rooflights before any work starts.
Cost
Area is the starting point, then preparation, the density of penetrations and rooflights, access, and how much of the drainage and detailing has to be renewed. Installed liquid rubber systems typically start around £34.50 per m² on qualifying projects of 300 m² and above.
Compare quotations line by line rather than on a single rate: preparation method, primer, membrane thickness, reinforcement at details, rooflight replacement, gutter works, access, waste and warranty. A cheap rate usually means less preparation, and preparation is the part that keeps the roof watertight.
Large areas, many penetrations, combustible contents below and no tolerance for a stripped roof: those four conditions shape the specification.
The search terms this page covers, and the answer each one gets.
| Search term | Intent | Answer on this page |
|---|---|---|
| warehouse roof refurbishment | Commercial | Survey-led repair or overlay, phased around operations |
| warehouse roof repairs | Commercial | Diagnose laps, fixings, rooflights and drainage before pricing |
| warehouse roof coating cost | Commercial | What drives the price and what a quotation should itemise |
| distribution centre roof refurbishment | Commercial | Zoned programmes for live despatch operations |
| asbestos cement warehouse roof | Informational | Material identification and controlled encapsulation limits |
There is no reliable single rate without an agreed scope. Compare material-only prices separately from supplied-and-installed quotations, and ask what each price includes.
SprayGrade carries a 15-year system warranty and HBS200 a 25-year system warranty, subject to the exact specification, installation and written conditions. Confirm the proposed build-up, exclusions, inspection requirements and whether workmanship cover is separate before placing an order.
Allow for the complete job, not just application output. Preparation, access, curing and weather determine the agreed completion date.
Measure the roof, identify materials and defects, and assess structure, moisture, fragility and drainage.
Confirm the system, preparation, repairs, access protection, work zones and site restrictions.
Use the preparation method appropriate to the material. Complete defect repairs and adhesion checks before coating.
Treat junctions and apply the specified membrane at the required thickness, planned around weather windows.
Record application checks, inspect details and drainage, and provide the agreed warranty and maintenance information.
The spray application runs at 600 to 800 m² per day, so a 5,000 m² roof is roughly a week of application. Preparation, rooflight replacement, gutter works and access are then added, giving a typical 2 to 6 week programme confirmed at survey.
Yes. Works are phased bay by bay so pick faces and dock doors keep working, and no area is left with an open roof overnight.
Where the deck and frame are sound, yes: there is no strip-out, no waste disposal and a much shorter programme. If the sheets are perforated or the insulation is saturated, replacement or overcladding becomes the honest recommendation.
A coating seals the roof but does not change its falls. Where ponding is significant, the survey will consider local screeding, additional outlets or drainage improvements alongside the membrane.
Failed or fragile rooflights are replaced as part of the scope, and sound ones are encapsulated around their kerbs. Both are priced in the same quotation so there is one point of responsibility.
Cold applied systems still need a dry substrate and temperatures within the product limits. Winter programmes are planned around forecast windows, with weather contingency built into the programme rather than discovered mid-works.
Send the postcode, approximate roof area, known covering, leak history and operating restrictions. Use existing photographs or drawings; do not access an unsafe roof to obtain them. Survey arrangements and timescales are confirmed with the team.