Fibre cement · asbestos cement · profiled sheet

Fibre cement roof coating, decided properly

Most fibre cement roofs fail at the surface and the fixings, not the structure. This page is the decision: what has failed, whether the sheets can be sealed, and what a coating scope actually contains.

01254 433987

The honest position: coating is the right answer for sound sheets with tired fixings. Where sheets have lost structural integrity, over-sheeting or replacement is the answer, and we will say so at survey.

Section through a coated sheet
fastener sealedlap bridged2.0 mm seamless membraneexisting fibre cement sheet
Seamless membrane
2.0 mm
Applied per day
600–800 m²
Minimum spray area
300 m²
System warranty available
15 yr

01

Decide before you buy a coating

Five checks decide whether a membrane is the right spend. Answer them honestly and the page gives you the position we would take at survey.

Is your roof a coating candidate?

Sheet condition
Fixings and laps
Water ingress
Material era
Access and structure

Verdict

Answer the five checks

The result reads from sheet condition, fixity, water ingress, material era and access, because those five decide whether a membrane is the right spend.

HBS200

Who applies it
You, or your own contractor
Right for
Localised repairs, one or two problem areas, roofs under 300 m²
How it is supplied
Supplied by the pack, with coverage stated in m² per pack
HBS200 specification

SprayGrade

Who applies it
Approved applicator, supply and install
Right for
Whole-roof refurbishment from 300 m², fragile roof controls and programme
How it is supplied
Specified, applied and warranted as one system
SprayGrade specification

02

The six failures we find on sheeted roofs

Fibre cement is porous and brittle. It fails at the surface and the fixings long before the sheet itself gives way, which is exactly why so many roofs can be sealed instead of stripped.

01

Carbonation and surface erosion

You see
Chalky, sandy surface, fibres visible on the weathering face.
What it means
The cement matrix has lost alkalinity and the surface is friable. Anything applied to a dusty, weak surface will bond to the dust, not the sheet.
If ignored
Delamination of the coating within a few seasons, and progressive thinning of the sheet.

02

Cracking at fixing lines

You see
Hairline cracks radiating from fasteners, often in a line up the slope.
What it means
The sheet is moving on its fasteners. The crack is the relief, and water tracks straight through it.
If ignored
Direct ingress into the building at every fixing, not just the cracked ones.

03

Corroded or loose fasteners

You see
Rust staining around washers, washers lifted, sheets springing when walked.
What it means
Fixity has been lost. The sheet is no longer held down as designed and lifts in wind.
If ignored
Progressive loss of fixity, sheet damage and a repair bill that grows with every gale.

04

Open laps and sheet movement

You see
Daylight or damp tracking at side laps, debris trapped along the lap line.
What it means
Capillary action draws water sideways along the lap, so the leak appears well away from the defect.
If ignored
Persistent damp patches with no obvious hole above them, and rot in purlins.

05

Moss, lichen and organic hold

You see
Green and black growth, usually heaviest on north slopes and in gutters.
What it means
Growth holds water against a porous sheet and hides the condition of the surface underneath.
If ignored
A permanently wet sheet, accelerated erosion, and a surface that no coating will bond to.

06

Brittle sheets and fragile rooflights

You see
Sheets that crack under footfall, aged rooflights with no mesh or guard.
What it means
The roof is a fragile surface. This is a safety and programme issue before it is a waterproofing one.
If ignored
A fatal fall risk. Fragile roof controls belong in the scope and the price from the outset.

03

Coating, over-sheeting or re-sheet, compared honestly

No scores, because the right route depends on the individual roof. These are the differences that actually decide it, and none of them are a judgement call.

Coating, over-sheeting or re-sheet, compared honestly
CriterionCoatingOver-sheetingRe-sheet
Added loadNegligibleNew sheet load on existing purlinsSame as original, if the deck is sound
Roof heightUnchangedRises by the depth of the new sheetRebuilt to the existing line
Thermal performanceUnchangedImproves where an insulated sheet is usedImproves if insulation is specified
Programme on 4,000 m²About a week of spraying, preparation included separatelySeveral weeksLongest, with strip-out and waste
DisruptionNo strip-out and no hot worksOver-roof working, building stays watertightOpen roof during strip-out
Asbestos cementSheets sealed in placeOld sheets stay as the substrateRemoval and licensed disposal
Cost positionUsually the lowest of the threeBetween the twoUsually the highest
Warranty15 year system warranty availableDepends on the sheet system usedDepends on the sheet system used
Coating
Sound sheets, tight fixings, structure with little spare capacity.
Over-sheeting
Sheets beyond coating, structure able to carry a new sheet, height acceptable.
Re-sheet
Structural failure, or the roof has to change thermally at the same time.

04

Asbestos cement, handled without theatre

Asbestos cement: the assessment comes before the specification

Most pre-2000 fibre cement roofs are asbestos cement. The material has to be identified and its condition assessed under the duty to manage before a work method is chosen, and the work category decides the controls and whether a licensed contractor is required.

Coating is usually the least disruptive route because the sheets are sealed in place rather than cut, broken or removed. Encapsulation does not remove the asbestos: it stays on the register and stays in the management plan.

  1. 1950s–1980s

    Asbestos cement sheeting widely used on industrial and agricultural roofs.

  2. 1985

    Blue and brown asbestos banned from import and new use in the UK.

  3. 1999

    White asbestos (chrysotile) banned, closing the asbestos cement era.

  4. 2000+

    Non-asbestos fibre cement sheeting becomes the norm, and still erodes the same way.

05

What the specification covers

Written to be compared against another quotation, line by line, rather than judged on a headline rate.

What a fibre cement coating scope contains when it is written properly, rather than sold as a rate per square metre.

Consumption, output and warranty terms are stated so a quotation can be compared line by line against another system.

Substrate
Fibre cement and asbestos cement profiled sheeting, assessed as sound
Preparation
Moss and debris removed, surface cleaned and dried; no abrasive method on asbestos cement
Repairs
Cracked or displaced sheets, corroded fasteners and failed rooflights dealt with before coating
Membrane
2.0 mm seamless liquid rubber, spray applied, reinforced at laps and details
Consumption
2.7 kg/m² for a 2 mm membrane, before detail and wastage allowances
Application
Airless spray above 300 m²; brush or roller below that
Output
600 to 800 m² per day, preparation excluded
Conditions
Sheets dry and within the product temperature limits at application
Detailing
Every fastener, lap, upstand, kerb and penetration encapsulated in the membrane
Warranty
15 year system warranty available, subject to written terms and application by an approved contractor

06

Where the money actually goes

On a sheeted roof the membrane is a small part of the price. Preparation and safe access dominate, which is why a rate per square metre with no survey is meaningless.

Why a square metre rate misleads

Two 4,000 m² sheeted roofs can differ by a factor of two on price: one is clean and accessed from a yard, the other is moss covered, above a live operation, with fragile rooflights every bay. Both are the same area.

Largest to smallest. The split varies with every roof.

  1. Preparation and moss removal

    Usually the single largest item on a weathered sheeted roof.

  2. Access, edge protection and fragile roof controls

    Scales with height, rooflights and the number of separate slopes.

  3. Sheet, fastener and rooflight repairs

    Priced from the survey, not assumed in the rate.

  4. Measured area, profile and number of slopes

    A deep profile takes more material than a shallow one.

  5. Membrane, spray application and detailing

    Fasteners, laps, upstands and kerbs take longer than the open field.

  6. Asbestos assessment, waste handling and VAT

    Depends on the material and the assessed work category.

07

What you hold at each stage

Documentation is part of the scope, not a favour after completion.

Survey

  • Sheet and fixing condition recorded
  • Material and asbestos position established
  • Falls, gutters and outlets checked
  • Access and fragile roof plan agreed

Works

  • Preparation records and photographs
  • Repairs signed off before coating
  • Application records per area
  • No section left open at shift end

Handover

  • Written specification and warranty
  • Detail photographs
  • Asbestos register updated where relevant
  • Maintenance schedule for outlets and gutters

08

Fibre cement questions, answered straight

Can fibre cement roof sheets be coated instead of replaced?

Yes, where the sheets are structurally sound and the fixings are still doing their job. The usual failure is surface erosion, cracking at fixings and corroded fasteners rather than the sheet itself, and a 2.0 mm membrane seals the surface, the laps and every fastener.

Can you coat asbestos cement roof sheets?

Yes where the material is assessed as suitable and the work is planned under the duty to manage. The sheets are sealed rather than disturbed, which reduces fibre release risk compared with removal, but the asbestos remains in place and stays on the register.

Can cracked fibre cement sheets be coated?

Hairline cracks and surface defects are bridged by a reinforced membrane. Sheets that are structurally broken, displaced or crumbling are replaced before coating, because a coating cannot restore structural strength.

Is coating cheaper than over-sheeting?

Usually, and it adds no load and no roof height. Over-sheeting becomes the better option where the sheets are beyond coating or where the roof needs additional thermal performance at the same time.

How long does a fibre cement roof coating take?

Application runs at 600 to 800 m² per day, so a 4,000 m² roof is around a week of spraying. Preparation of a porous, mossy surface takes longer than the coating and is where realistic programmes are won or lost.

How long will the coating last?

A 15 year system warranty is available subject to written terms. On fibre cement, service life depends heavily on preparation, because a porous or contaminated surface is the main reason coatings fail early.

Does the roof need to be dry before coating?

Yes. The sheets must be dry and within the product temperature limits. Sheeted roofs dry quickly once moss and debris are removed, which is one reason preparation is scheduled ahead of the spray.

Does coating a fibre cement roof help with condensation?

No. A coating stops water getting in from outside. Condensation comes from inside the building and is a ventilation and insulation question, diagnosed separately at survey rather than assumed to be solved by a membrane.

09