Cut edge corrosion spreading along the eaves
Once the protective coating is broken at a cut edge, corrosion creeps back under it. Cleaning and treating that edge before coating is what stops it continuing.
Profiled steel, plastisol and aluminium roofs
Yes, where the sheeting still has structural capacity and corrosion is at the surface rather than through the sheet. A metal roof coating system cleans and prepares the profile, treats cut edges and fixings, and bonds a seamless liquid rubber membrane to the steel. It interrupts the corrosion cycle, seals every lap and fastener in one layer, and avoids stripping the roof.
Investigate the cause before specifying repairs or a coating.
Once the protective coating is broken at a cut edge, corrosion creeps back under it. Cleaning and treating that edge before coating is what stops it continuing.
Hundreds of fixings penetrate the sheet. Each perished washer is a leak path, and they are sealed by the membrane rather than individually patched.
Almost always an adhesion problem: contamination left in place, no primer, or a coating applied over a chalked factory finish without preparation.
Old profiled sheets and rooflights may not be safe to walk on. Fragile roof controls and safe access are planned before work starts, not improvised on site.
The sheet, the fixings and the insulation decide which of the three is honest.
Where sheets are structurally sound and the problem is laps, fixings, cut edges or a chalked factory finish.
Adds a new sheet above the old. It increases load and raises the roof line, and the existing roof stays in place underneath.
Where sheets are perforated, purlins have lost section or the roof needs to change thermally.
Failure modes
The middle of a metal sheet is usually sound. Failure concentrates at the edges and interfaces: cut edge corrosion creeping back from eaves and gutter line, fastener heads where the sealing washer has perished, laps where the original sealant has hardened, and flashings that have moved with thermal cycling.
Plastisol and similar factory coatings also chalk and thin under UV, which is a finish problem rather than a waterproofing one until the steel underneath starts to corrode. Understanding which of these is happening decides whether a coating, a repair or overcladding is the right answer.
Options
Coating suits a roof whose sheets are structurally sound and whose problem is water ingress at laps, fixings and edges. It adds almost no weight, needs no crane, and can be done in phases without an open roof.
Overcladding adds a new sheet above the old, which increases load, raises the roof line and usually requires the old roof to remain as a substrate. Re-sheeting is the right answer where sheets are perforated, purlins have lost section, or the roof needs to change thermally. Ask which one the survey supports before discussing price.
Preparation
A coating is only as good as the bond beneath it. That means removing contamination, treating corrosion, dealing with loose factory coatings, priming where the system requires it, and checking adhesion before the full roof is sprayed.
This is the difference between a membrane and a paint. A decorative roof paint sits on the surface and follows every movement of the sheet until it cracks; a reinforced liquid rubber membrane is specified with the thickness and detailing to accommodate that movement.
Comfort
If the complaint is dripping from the underside of a metal roof in cold weather, that is condensation, and a coating on the outside will not fix it. The remedy is ventilation, a vapour control layer or additional insulation, and it should be diagnosed at survey rather than discovered after the roof has been coated.
Solar gain is different again. A reflective finish can reduce surface temperature and thermal movement, and it is worth specifying on roofs with high solar exposure, but it is a performance addition rather than a waterproofing one.
A seamless membrane over a profiled, moving, heavily penetrated substrate: that is the engineering case for liquid rubber on steel.
The search terms this page covers, and the answer each one gets.
| Search term | Intent | Answer on this page |
|---|---|---|
| metal roof coating | Commercial | A seamless membrane over prepared profiled steel |
| metal roof refurbishment | Commercial | Coating, overcladding and re-sheeting compared |
| cut edge corrosion treatment | Informational | Why corrosion starts at the eaves and gutter line |
| metal roof leaking at fixings | Informational | Perished washers and backed-out fasteners |
| metal roof condensation | Informational | Why a coating will not stop internal dripping |
The coating is rarely the largest item. Preparation, access and the condition of the sheets decide the number.
SprayGrade carries a 15-year system warranty and HBS200 a 25-year system warranty, subject to the exact specification, installation and written conditions. Confirm the proposed build-up, exclusions, inspection requirements and whether workmanship cover is separate before placing an order.
Allow for the complete job, not just application output. Preparation, access, curing and weather determine the agreed completion date.
Measure the roof, identify materials and defects, and assess structure, moisture, fragility and drainage.
Confirm the system, preparation, repairs, access protection, work zones and site restrictions.
Use the preparation method appropriate to the material. Complete defect repairs and adhesion checks before coating.
Treat junctions and apply the specified membrane at the required thickness, planned around weather windows.
Record application checks, inspect details and drainage, and provide the agreed warranty and maintenance information.
Yes, with correct preparation. Galvanised surfaces need cleaning and, depending on condition, a suitable primer to achieve adhesion. Adhesion is checked before the main application rather than assumed.
It interrupts the corrosion cycle by sealing the surface and cut edges from water and oxygen. Existing corrosion has to be treated first, and sections that have corroded through cannot be rebuilt by a coating.
The system is a 2.0 mm liquid rubber membrane with a 15 year system warranty available, subject to written terms. Life depends on preparation, specification and maintenance of gutters, outlets and details.
Often yes, after assessment of the factory coating's condition and adhesion. Chalked or flaking plastisol needs preparation before any coating will bond reliably.
No. Condensation is a thermal and ventilation issue on the underside of the sheet. It should be diagnosed separately, otherwise a perfectly good roof coating will not solve the complaint.
Usually, and it adds no load to the structure. Overcladding becomes the better route where sheets are perforated or the roof needs to change thermally.
Send the postcode, approximate roof area, known covering, leak history and operating restrictions. Use existing photographs or drawings; do not access an unsafe roof to obtain them. Survey arrangements and timescales are confirmed with the team.