Industrial roofing
Industrial Roofing Contractors
Industrial roofs fail in predictable places: sheet laps, fixings, cut edges, gutters and rooflights. A contractor who prices those details properly is the one to appoint.
Quick answer
Industrial roofing contractors refurbish, coat and waterproof factory and warehouse roofs. Where the existing sheets are structurally sound, a spray applied liquid rubber overlay renews the waterproofing in place: 600 to 800 m² per day, from £34.50/m² installed, with production running underneath.
Where industrial roofs fail
Cut edge corrosion on plastisol sheets, failed sealant at laps, backed-out fixings, blocked or leaking gutters, perished rooflight seals and ponding at outlets. Coating over a roof without addressing those defects traps the problem and voids the warranty.
Working on a live industrial site
No hot works, no bitumen boiler and no open roof. Access by MEWP or scaffold, edge protection to current standards, deliveries sequenced around shifts, and a phasing plan agreed with the site manager before mobilisation.
Overlay, overcladding or replacement
Overlay suits sound sheets with surface corrosion. Overcladding suits roofs that need a new covering and better thermal performance. Replacement is the honest answer when sheets are perforated, fixings have failed across the roof, or the structure is compromised.
What the works include
How it is priced
Industrial roof coating starts at £34.50 per m² installed for 300 m² and above. Preparation and access do most to move the rate: a roof with heavy corrosion, poor access or many penetrations costs more than an open roof of the same area.
Speak to the technical team
Send drawings, photos and the postcode. Surveys for commercial projects are normally arranged within 48 hours.
01254 433987Industrial Roofing Contractors: questions
What do industrial roofing contractors do?
Survey the roof, specify a repair or refurbishment, prepare the substrate, install the waterproofing, deal with gutters and details, and provide a warranty. On sound roofs that usually means an overlay rather than strip and replace.
Can the factory keep running during roof works?
Yes. Cold applied liquid systems avoid flames, boilers and strip-out, so there is no open roof over production. Work is phased by bay or zone, with access and deliveries agreed around shifts.
Do you treat cut edge corrosion?
Yes. Cut edges, laps and fixings are prepared and treated before the membrane goes on. Coating over untreated corrosion is the most common cause of early failure on industrial roofs.
How much does industrial roof refurbishment cost?
From £34.50 per m² installed for spray applied liquid rubber on 300 m² and above, or around £40 per m² in material for hand applied HBS200. Replacement costs more because of strip-out, waste and new decking.
What area qualifies for spray application?
300 m² and above. Below that, mobilisation outweighs the speed advantage and hand applied HBS200 is better value.
