A waterproof coating for a concrete roof needs a sound, prepared surface and carefully designed cracks, joints and terminations. Discuss the concrete condition and complete roof build-up before selecting materials.

Discuss a concrete roof

01Assess the concrete surface

Identify loose material, laitance, contamination, existing treatments and moisture. A preparation method and any primer should be selected for the actual condition of the concrete and the chosen system.

02Design cracks, joints and drainage

Movement joints, cracks, penetrations and the edge of the membrane require details within the specification. Establish falls and outlets so the waterproofing works with the drainage design. Structural defects require separate assessment.

03Account for the finished use

An exposed roof, a protected roof and a pedestrian terrace have different demands. Confirm what will sit above the membrane and how it will be maintained. Include any protection or finish in the system assessment and quotation.

Direct answer

How do you waterproof concrete?

Concrete is porous, so waterproofing it means sealing the whole surface with a continuous membrane once it is sound, clean and dry. HBS200 liquid rubber is applied at 2.7 kg per m² to form a 2 mm seamless membrane that bonds to the concrete and stretches with it, covering roofs, plant rooms, retaining walls, basements and floor slabs. Cracks and construction joints are opened, filled and reinforced first, because a coating over a live crack simply splits with it.

Coverage
2.7 kg per m² for a 2 mm cured membrane
Cure
Cold applied, no flame or hot works
Flexibility
Approximately 900% elongation, so it bridges minor movement
Key step
Cracks and joints filled and reinforced before coating
Surfaces
Roof slabs, plant rooms, retaining walls, basements and floors
Minimum prep
Sound substrate, free of laitance, dust and curing compounds

Why concrete leaks

Why concrete needs a membrane over it

Concrete is strong in compression and porous in every other respect. Water moves through it by capillary action, and it finds the weakest lines first: construction joints, day joints, tie holes, honeycombed areas and hairline cracks that open as the slab moves. A concrete roof or basement without a membrane is a sponge with good structural manners.

That is why treating a damp concrete surface with a sealer rarely lasts. A surface sealer sits on the top few millimetres and cracks when the slab moves. A bonded elastomeric membrane takes the movement and keeps the water out, provided the substrate underneath is sound and properly prepared.

Preparation

The preparation concrete actually needs

New concrete has to be cured properly before coating, and any curing compound, release agent or laitance has to be removed. Laitance is the weak, dusty layer that rises to the surface during placing; a coating bonded to laitance is bonded to dust. Mechanical preparation, then cleaning and drying, comes before primer.

Cracks and joints need structural attention, not just a coat of paint. Cracks are opened, filled and bridged with reinforcing fabric. Movement joints are treated as movement joints, with a suitable joint detail rather than being buried under a rigid coat. Tie holes and blowholes are filled and dressed.

Primer selection matters on concrete because absorption varies. A porous slab takes a different primer and different rate from a dense, power floated one, and getting that wrong shows as blistering within a season.

  • Remove laitance, curing compounds and release agents
  • Allow new concrete to cure before coating
  • Open, fill and reinforce cracks
  • Detail movement joints properly
  • Fill tie holes and blowholes
  • Prime according to the absorption of the slab

Cost

Cost and where liquid rubber fits

Material cost follows coverage: 2.7 kg per m² for a 2 mm membrane, so a 30 m² area is around 81 kg before allowing for details. The calculator converts a measured area into packs and a material price, and the quote builder prices preparation and primer alongside it.

On larger commercial areas, and where a concrete roof needs a warranted system at volume, the spray applied SprayGrade route is priced per square metre installed from around £34.50 for qualifying 300 m² projects, after survey.

The problems this solves

Damp coming through a slab

Concrete wicks water through capillary action. A continuous bonded membrane stops the path rather than trying to dry the inside of the building.

Cracks reopening after sealing

Rigid sealers split where the slab moves. An elastomeric membrane stretches with the crack and recovers.

Leaking construction joints

Joints are the first line water finds. They are opened, filled and reinforced before the membrane goes across them.

Failed sealers and paints

Surface coatings on concrete fail from underneath when the slab is damp. Preparation and a bonded membrane address the cause.

Where liquid rubber suits concrete

The membrane bonds to a prepared slab, moves with it and has no joints of its own.

Roof slabs
Flat concrete roofs and podium decks
Plant rooms
Floor and wall waterproofing where plant is housed
Below ground
Retaining walls and basement tanking, with protection where required
Coverage
2.7 kg per m² for a 2 mm membrane
Application
Brush, roller or airless spray
Compare cost and programme for your project

Questions answered

Can you waterproof concrete without a membrane?

Integral additives and crystalline systems treat the concrete itself, which suits some below ground structures. For roofs, plant rooms and decks, a bonded elastomeric membrane is the more reliable answer because it handles movement and provides a continuous barrier.

How soon can new concrete be coated?

Once it has cured enough for the moisture level to fall within the primer's limits and any curing compound has been removed. Coating green concrete traps water and the membrane will blister.

Will liquid rubber bridge cracks in concrete?

It bridges hairline and minor cracks because it is elastomeric. Structural cracks and live joints need a proper repair and joint detail first, with the membrane reinforced across them.

How much material does a concrete roof need?

2.7 kg per m² for a 2 mm membrane, plus an allowance for upstands and details. Use the calculator with the measured area to get packs and a material cost.

Questions before you specify

Can liquid rubber waterproof a concrete roof?

HBS200 can be considered for compatible concrete within a specified waterproofing system. Assess the surface condition, moisture, contamination, cracks and any existing coating. Confirm preparation, primer, reinforcement and membrane thickness before application.

Will liquid rubber concrete waterproofing repair structural cracks?

No. A flexible coating is not a structural repair. Establish the cause and movement of cracks, design the repair and joint details, and then specify the waterproofing. Where the surface will be walked on or covered, the protection and finish must also be compatible.