Specify a balcony waterproofing membrane together with drainage, thresholds, upstands and the final walking surface. A base waterproofing coating is not automatically a finished pedestrian surface.
Provide the area, existing surface, edge details, door thresholds, outlets and any existing tiles or paving. Record how the balcony is used and whether rooms are occupied beneath it.
02Specify the waterproofing and finish together
Choose the membrane, protective layer and pedestrian finish as a compatible build-up. Include movement, slip resistance requirements, maintenance access and drainage. Do not leave a base membrane exposed to traffic without a suitable specification.
03Check refurbishment constraints
Existing moisture, threshold height and the weight of new finishes can affect the solution. Request an assessment before retaining old layers or adding a new finish. Send photographs and dimensions for the initial discussion.
A balcony needs a seamless, fully bonded membrane that turns up the wall and over the threshold, because the details are where balconies fail. Liquid rubber is applied at 2.7 kg per m² over a prepared deck, reinforced at the wall junction, door threshold, corners and drainage outlet, and finished with a suitable top coat where the surface is walked on. It has no laps and no joints, so there is no seam for water to get behind.
Walkable once cured, with a suitable top coat where needed
Falls
Must drain away from the building to an outlet
Application
Cold applied, no flame near timber or glazing
Substrates
Concrete, felt, GRP, metal and timber decks, prepared to suit
Why balconies leak
The four details that cause most balcony leaks
Balconies leak at the door threshold, the wall junction, the outlet and the balustrade fixings. Each is an interruption in the surface where two materials meet and movement happens. A sheet membrane has to be cut and lapped at every one, and every lap is a place water can get behind.
The threshold is the hardest. Water on the deck has to be kept below the door cill, which means the finished waterproofing level, the drainage fall and the door detail all have to agree. Getting that wrong does not show as a leak on the balcony, it shows as damp inside the room behind it.
Preparation
What has to be right before coating a balcony
Falls come first. A balcony that holds water will fail whatever membrane is used, so ponding areas are made good with a suitable screed before coating. Timber decks need to be sound, dry and stable, with any movement addressed, because the membrane will follow the deck.
Then the surface is cleaned of loose material and contamination, and primed for the substrate. Upstands, corners and around the outlet are reinforced with fabric before the field coats, and the membrane is carried up the wall to a height that keeps splash and driven rain out rather than stopping at floor level.
Balustrade posts and fixings are detailed deliberately: either set before the membrane with the coating dressed around them, or fixed afterwards through a properly sealed base plate.
Correct falls to the outlet, no ponding
Sound, dry, stable deck before coating
Reinforcing fabric at corners and junctions
Membrane carried up the wall, not stopped at floor level
Threshold detail agreed with the door
Outlets and balustrade fixings sealed individually
Finishing
Cost and finish for a walkable balcony
Material follows coverage: 2.7 kg per m² for a 2 mm membrane, plus allowance for the upstand perimeter and details. A typical domestic balcony comes out under the area where the spray applied commercial system becomes economic, so brush or roller application is the right route.
Where the balcony is walked on regularly, a suitable top coat or finish is specified over the membrane. That is a finish decision rather than a waterproofing one: the membrane is the barrier, and the finish protects it from abrasion and gives the appearance wanted.
The problems this solves
Laps and seams failing at corners
Balconies are almost all detail, so a sheet system needs many cuts and laps. A seamless membrane removes them at the most vulnerable points.
Water tracking back to the door
Water on the deck below the threshold soaks into the wall. Correct levels, falls and a raised threshold detail are what keep the room dry.
Ponding on a shallow balcony
Standing water shortens the life of any membrane. Falls are corrected before coating, not afterwards.
Leaks at balustrade fixings
Every fixing is a hole. They are detailed and sealed individually rather than being left for sealant later.
Where liquid rubber suits balconies
Small, detail heavy and walked on: the system suits all three characteristics.
Surfaces
Concrete, felt, GRP, metal and timber decks
Membrane
2 mm seamless liquid rubber, fully bonded
Details
Threshold, wall junction, corners and outlet reinforced
Finish
Walkable once cured, with top coat where specified
Yes, and it is well suited because it is seamless and walkable once cured. The deck needs sound falls, correct preparation and a primer suited to the substrate.
Do I need a top coat on a balcony?
Where the balcony is regularly walked on, a suitable finish is specified over the membrane for abrasion resistance and appearance. The membrane itself is the waterproof layer.
How high up the wall should the membrane go?
High enough to keep splash and driven rain out, and in practice up to a level that terminates under a trim or into the wall detail rather than stopping at floor level.
How much material does a balcony need?
2.7 kg per m² for the deck plus the upstand perimeter and an allowance for details. The calculator on the site converts a measured area into packs.
Can liquid rubber be used for balcony waterproofing?
A liquid-applied membrane may be considered within a compatible balcony build-up. Confirm the substrate, drainage, movement joints, door thresholds and the specified protective or wearing finish. The complete system must suit pedestrian use and the proposed installation conditions.
Can I tile directly over liquid rubber terrace waterproofing?
Do not assume that any tile adhesive or finish can bond directly to the coating. Confirm the complete waterproofing, protection and finish system with the manufacturer. Include drainage, movement joints and threshold heights in the design before materials are ordered.